This department maintains all sanitary sewer collection
lines and pumps necessary for the flow of wastewater to
reach the wastewater treatment plant. New collection systems
are constructed by this department.
Wastewater Treatment Plant
The plant is operated by one (1) lead operator and one
(1) plant operator. The responsibility of this operation
is to treat wastewater to confirm compliance with our discharge
permit prior to being released into the waterways.
Water Distribution System
This department maintains all water distribution lines
and pumps necessary for the flow of treated water from our
water treatment plants to our customers. This department
always stands ready to respond to any after business hours
maintenance issues.
Water Treatment Plant
This plant operates an intake from the Duck River in western
Humphreys County. The untreated water is pumped to our treatment
plant where it is processed and tested prior to being sent
into the distribution system. The plant is operated by one
(1) lead operator and one (1) plant operator. The operators
are responsible for the operation of 3 deep wells with an
above ground filtration system. Four water storage tanks
are incorporated within the water system with a large section
of western and southern Humphreys County served by the municipal
water system.
City Hall | 101 East Main Street | Waverly, TN 37185 | (931) 296-1434 Fax |
(931) 296-2101